End-to-end Enhanced Rock Weathering (ERW) Consultancy

Our specialization enables organizations to design, evaluate, and scale carbon removal projects with confidence.

 

Eartures – Work Packages
Service Packages

Six Registry-Aligned Work Packages

Structured to cover every chapter of both Puro.earth 2025 and Isometric EW Protocol — from pre-deployment eligibility through audit submission.

WP0 NEW

Pre-Deployment: Feedstock, Site & Risk

4–6 weeks
Deliverables
Feedstock XRF analysis and CDRmax calculation (Steinour formula)
PTE risk assessment: hazard characterisation, exposure pathways, risk conclusions
Site eligibility documentation (soil type, climate, land-use compatibility)
Additionality demonstration and counterfactual scenario documentation
Heavy metal screening report (Cr, Ni, Cd, Pb, As) with regulatory threshold comparison
Registry Chapter Coverage

Puro.earth: Ch.3 (eligibility), Ch.4 (risk assessment 5-step framework), Ch.3.6 (feedstock characterisation). Isometric: S.4 (applicability), S.5 (environmental & social safeguards), S.8 (feedstock characterisation module).

WP1 EXPANDED

Baseline, Hydrology & Monitoring Design

8–10 weeks
Deliverables
Hydrological characterisation report (river networks, catchments, GW–SW interactions)
Pre-application baseline soil and water chemistry (for counterfactual calculation)
Formal monitoring plan document (registry-submission-ready)
Control plot design (Isometric 2-plot vs 3-plot selection with justification)
Statistical power analysis to meet 95% confidence threshold
SMEW codebase review report
Registry Chapter Coverage

Puro.earth: Ch.6.2 (Cbaseline), Ch.9 (monitoring plan), Ch.11.1–11.2 (strata, sampling). Isometric: S.7.2 (baseline), S.9.3 (pre-deployment monitoring, plot design), S.9.3.4.2 (statistical requirements).

WP2 REFINED

Measurement, Modelling Setup & Data Integration

8–10 weeks
Deliverables
Sampling and data-use strategy (solid phase, aqueous phase, monitoring data)
Dual-approach quantification design (Puro 2025 requirement)
Calibrated PHREEQC models for soil, pore-water, and riverine chemistry
Calibrated CO2SYS model for ocean carbonate systems
SMEW adaptation plan with DRN integration roadmap
Registry Chapter Coverage

Puro.earth: Ch.11.3 (six quantification approaches, dual-approach mandate), Ch.12 (simulation model guidelines). Isometric: S.7.4.1 (quantification and validation options, soil-based and aqueous-phase methods).

WP3 CORE

DRN Implementation & SMEW Calibration

10–12 weeks
Deliverables
Implemented DRN model for project river network (documented, version-controlled)
Linked DRN–SMEW system for dissolved inorganic carbon export
Calibrated SMEW parameters (dissolution kinetics, transport, retention, losses)
Preliminary CDR scenario simulations with near-field + far-field contributions
Registry Chapter Coverage

Puro.earth: Ch.6.3 (Closs — river and ocean loss terms), Ch.12 (process-based model requirements). Isometric: S.9.3.5 (watershed/rivers, ocean sections). This is Eartures' core differentiator.

WP4 NEW

LCA, Leakage & Project Emissions

6–8 weeks
Deliverables
Cradle-to-gate Life Cycle Assessment (mining, crushing, transport, spreading)
Operational and embodied emissions quantification
Leakage emissions identification, characterisation, and quantification
SOC (Soil Organic Carbon) change assessment
Emissions accounting formatted for CORC equation and Isometric net CDR calculation
Registry Chapter Coverage

Puro.earth: Ch.7 (project emissions — LCA scope, operational, embodied), Ch.8 (leakage). Isometric: S.7.4.3 (all emissions sub-sections), plus Embodied Emissions, Energy Use, and Transportation modules.

WP5 EXPANDED

Validation & Audit-Ready Package

8–10 weeks
Deliverables
Model validation against monitoring data, mass balance, and literature ranges
Uncertainty and sensitivity analyses (weathering rates, partitioning, hydraulic parameters, export fractions)
Uncertainty discount calculation (Bayesian/frequentist for CORC equation)
Finalised parameter sets for riverine losses and oceanic uptake
Registry-specific formatted reports (Puro Ch.13, Isometric Certify templates)
Clean, annotated scripts (PHREEQC, CO2SYS, SMEW, DRN) with full documentation
Auditor liaison support (up to 2 audit rounds)
Registry Chapter Coverage

Puro.earth: Ch.10 (uncertainty quantification and discounting), Ch.13 (reporting requirements). Isometric: S.6.2 (verification and validation), S.6.5 (uncertainty reporting), S.9.5 (recordkeeping).

Full programme: 40–52 weeks
WP0
4–6 wks
WP1
8–10 wks
WP2
8–10 wks
WP3
10–12 wks
WP4
6–8 wks
WP5
8–10 wks

WP0 and WP4 can run in parallel with adjacent WPs to compress timeline to ~36 weeks

[ 1 ]

Feasibility & Site Assessment

[ 2 ]

Resource Strategy & Planning

[ 3 ]

Carbon Removal Modeling

[ 4 ]

MRV System Design (Monitoring, Reporting, Verification)

[ 5 ]

Carbon Credit & Market Advisory

We translate complex geochemical processes into actionable strategies for real-world deployment.

Book a Consultation